Skip to product information
*S14 Drivelines

*S14 Drivelines

$535.00 USD
SKU: S14-JZ-W58

Pickup available at Xcessive Manfuacturing

Usually ready in 2-4 days

View store information

*S14 Drivelines

S14-JZ-W58 / None

Xcessive Manfuacturing

Pickup available, usually ready in 2-4 days

7700 Southwest 69th Avenue
Portland OR 97223
United States

+15035042147
Product Details

When you do an engine or transmission swap in an S14, from JZ to VH or VK swaps, we can make the driveline to get it done.

General fitment

The fitment of our drivelines is based on our swap motor brackets and cross member and in some cases, transmission adapters. The fitment is based on the S14 NON-ABS chassis. If you have a different set up for any of those parts, email or call us to confirm fitment information. It's also a good idea to check with us if you've done a diff swap away from the S14 NON-ABS. These drivelines will be to long for ABS, Q45 and other differentials!

Supported transmissions

While many transmissions are "similar" in fitment, we build each driveline for it's specific application. If you don't see your engine or transmission listed, you can always give us a call or an email to see if we can make it for you.

Non-Spec Drivelines

All drivelines are made in house, so we can typically accommodate most shafts to suit your needs. If you've done you're own motor mounts, are using a different gearbox such as a G-Force dog box or have done a Q45 diff swap, just send us an email or give us a call and we can get the details worked out.

Construction

We make all of our drivelines from new 3" x .083 DOM steel. We've found steel to handle the most abuse and last the longest but we can also make aluminum shafts, just inquire for cost. All shafts are hydraulically pressed together in phase, rotationally welded then straightened before spin balancing. The universal joints are size 1310 and the slip yolk and rear flanges are sized to match, no stepped down conversion universal joints. All components are new, never sourced from old drivelines.

Please allow 5-7 days to complete a shaft for shipment.

Related items